In the early stage of project planning, BIM technology is used to establish a 3D model for site layout and to coordinate with the preparation of project construction organization design. The model is adjusted and optimized according to the construction stage to ensure the accuracy of the model.
Traditional structure deepening design needs to look through many drawings, and then complete the conversion of two-dimensional graphics to three-dimensional graphics with the three-dimensional imagination of technicians, which is inefficient and error-prone. Combined with BIM model, problems, hazards, loss of profits, risk and cost can be found more efficiently in the future construction process.